Stage 5 of 5 · Decision

Better decisions at every level.

Operators respond sooner, engineers find root causes faster, and leadership sees performance across sites with confidence in the numbers.

Credentials and standards
  • AVEVA Select Partner
  • IEC 62443
  • ISA-18.2
  • Cyber Security Act, 2020

Decision

Who benefits

  • OperatorsReal-time awareness and alarms.
  • EngineersTrends, root cause and optimisation.
  • LeadershipCross-site performance and reporting.

The operating data path

Where this stage fits

Each stage builds on the one before it. Select a stage to explore it.

  1. 05 Decision

    Better decisions at every level.

    Operators respond sooner, engineers find root causes faster, and leadership sees performance across sites with confidence in the numbers.

    • Operators
    • Engineers
    • Leadership

    People

  2. 04 Intelligence

    Information people actually use.

    Data only creates value when the right people can see it clearly.

    • PI Vision
    • Dashboards
    • Operational analytics

    Level 4

  3. Secure conduit

    OT security separates the plant network from the enterprise network and protects the data path between them.

    • Firewall
    • DMZ
    • IEC 62443

    Level 3.5

    Enterprise networkOT network
  4. 03 Industrial data

    One trusted record of the operation.

    The AVEVA PI System collects high-fidelity, time-series data from across your control systems and stores it as a single, reliable history.

    • PI System historian
    • Asset Framework
    • Data quality

    Level 3

  5. 02 Control systems

    Reliable control at the plant floor.

    PLCs, DCS, SCADA and HMIs run the process minute by minute.

    • PLC / DCS
    • SCADA
    • HMI

    Levels 1–2

  6. 01 Plant

    Where operational data begins.

    Every pump, mill, turbine and line generates signals about how the operation is performing.

    • Machines
    • Equipment
    • Sensors

    Level 0

Data rises from the process to the people who decide. Levels follow the ISA-95 / Purdue reference model.

In practice

Decisions it supports

  1. 01
    Shift handoverA shared, factual view of what happened on the shift.
  2. 02
    Root cause investigationsTrends and event history in one place.
  3. 03
    Maintenance planningCondition data to plan maintenance before failure.
  4. 04
    Management reviewCross-site KPIs from one trusted source.

Outcome

An operation run on evidence, not assumptions.

Next step

Talk to us.

Tell us about your site, your data and your operational goals, and we will arrange a time to talk.

Prefer to call? +233 54 083 8349WhatsApp +233 53 439 3537